YEAR-END REPORTS
The story of your success.
This slide is a part of: Calendars 2025 timelines graphics US format (PPT tables and icons)
Three-year Plan
Slide Content
This slide presents a three-year plan with a timeline highlighting five projects. The projects are spatially arranged to signify their start and end months over a three-year period starting from 2025 to 2027. Project 1 spans a significant part of the year 2025. Project 2 seems to cover the latter half of 2025 and wraps up in the first half of 2026. Project 3 extends through most of 2026 with clear start and end points. Project 4 is depicted to begin in the late 2026 and carry into 2027. Finally, Project 5 is allocated to commence and conclude within the year 2027.
Graphical Look
- The slide's title is prominently displayed at the top center in a large, bold font.
- A Gantt chart occupies the majority of the slide, indicating a project timeline.
- The chart has a horizontal orientation, divided into three main rows, each one representing an individual year from 2025 to 2027.
- Columns represent months, each abbreviated to three letters (Jan., Feb., Mar., etc.).
- Each project is represented by a colored bar with an arrow at each end, suggesting the duration, and is labeled with the project's name.
- The colors of the project bars vary: sky blue, red, green, orange, and another shade of blue.
- The background of the chart alternates between white and light gray for visual segmentation of the years and months.
- The slide utilizes a sans-serif font for a clean and modern text appearance.
The slide is organized with a clean and straightforward layout that utilizes a color-coding scheme to differentiate between the various projects. The use of a Gantt chart allows for easy visualization of the projects' timelines and their respective durations over the three-year span.
Use Cases
- Planning and illustrating a company's strategic initiatives spanning multiple years in a high-level executive meeting.
-
- Visualizing resource allocation and project timelines for internal project management and team coordination discussions.
- Presenting a roadmap of project timelines to stakeholders for alignment and transparency in terms of expected milestones.
- Utilizing during an annual company retreat or planning session to facilitate discussions about future goals, dependencies, and priorities.
Three-year Plan
Fully editable slide
compatible with PowerPoint, Google Slides, Keynote
This slide can be purchased as a part of a content-ready deck or individually through a subscription